PXM GPW mWIG40 Periodic report · PAP Biznes

Polimex Mostostal SA (PXM) · Q2 2026 results and valuation

Share price: 7.01 zł · 2026-11-10

Polimex Mostostal SA provides construction and assembly services, industrial equipment installation, production, and property management. The group operates in the energy, oil, gas, chemical, and infrastructure sectors, performing projects both in Poland and abroad. Sources: Half-year report (2026-08-31) · Wikipedia

Results Q2 2026 vs Q2 2025 · year over year · published 31 Aug 2026 and 25 Aug 2025

Net income down 19.6% year on year. The language turned more upbeat.

1 · Numbers

−19.6%

Net income vs Q2 2025

Net income 39.8M vs 49.4M

Revenue −3.0%

2 · How the report reads

More upbeat

Language tone vs last period

Report language: typical for a company report — more upbeat than in Q2 2025.

Weak signal: formal report language, not a call.

3 · What stood out

The total lump-sum remuneration for the task is 1,185 million PLN net and 260 million EUR net, of which Polimex Mostostal SA will be entitled to 1,159 million PLN net.

Valuation

Is Polimex Mostostal SA undervalued?

Reverse DCF. Free cash flow from the last full fiscal year (2025-12-31), grown for 10 years, discounted back, plus a terminal value. “Implied growth” is the rate the current price assumes.

At 3.0% growth a year (3-year revenue growth), the model's fair value is 14.09 zł a share — the stock trades 50% below it. Today's price assumes −11.2% growth a year.

Current price

7.01 zł

close of 2026-11-10

Market implies growth of iThe yearly free-cash-flow growth, for the next 10 years, that today’s share price already assumes. If you believe the company grows faster than this, the stock is cheap under this model; slower, and it is expensive.

-11.2% for 10 yrs

Fair value / share

14.09 zł

Buy below

10.57 zł

Price vs fair value

Undervalued 50%

Price vs buy-below price

Undervalued 34%

Official channels

The company's own website and social media accounts.

Read between the lines

  1. Key theme

    The subject of the EPC Agreement is the implementation under the 'design and build' system in Nowe Czarnowo (Gryfino municipality) of one peak-load gas unit operating in a simple cycle (OCGT) with a net output power not…

    Source quote
    “The subject of the EPC Agreement is the implementation under the 'design and build' system in Nowe Czarnowo (Gryfino municipality) of one peak-load gas unit operating in a simple cycle (OCGT) with a net output power not exceeding 600 MW electric, including auxiliary systems (the "Task")." — notable figure this quarter (salience: 89) The subject of the EPC Agreement is the implementation under the "design and build" system in Nowe Czarnowo (Gryfino municipality) of one peak-load gas unit operating in a simple cycle (OCGT) with a net output power not exceeding 600 MW electric, including auxiliary systems (the "Task").”
  2. Figure

    The availability period for a 90 million PLN credit limit was extended to December 31, 2026, following the conclusion of an Addendum.

    Source quote
    “As a result of concluding the Annex, the availability period of the limit in the amount of 90 million PLN was extended to December 31, 2026.”
  3. Key theme

    The total lump-sum remuneration for the Task is 1,185 million PLN net and 260 million EUR net, of which 1,159 million PLN net will be allocated to the Company.

    Source quote
    “The remuneration for the performance of the Task is of a lump-sum nature (with the possibility of indexation in the event of circumstances provided for in the EPC Agreement) and amounts to PLN 1,185 million net and EUR 260 million net (collectively the "Remuneration") increased by the applicable VAT tax ("Gross Remuneration"), of which the Company will be entitled to PLN 1,159 million net increased by the applicable VAT tax." — notable figure this quarter (salience: 89) The remuneration for the performance of the Task is of a lump-sum nature (with the possibility of indexation in the event of circumstances provided for in the EPC Agreement) and amounts to PLN 1,185 million net and EUR 260 million net (collectively the "Remuneration") increased by the applicable VAT tax ("Gross Remuneration"), of which the Company will be entitled to PLN 1,159 million net increased by the applicable VAT tax.”
  4. Key theme

    The subject of the Letter of Intent is to enter into cooperation in order to prepare and conduct actions aimed at the merger ("Merger") of JELCZ (the acquiring company) with RFK (the acquired company) pursuant to Art. 492 § 1 point 1 of the Commercial Companies Code." — notable figure this quarter (salience: 86) The subject of the Letter of Intent is to enter into cooperation in order to prepare and conduct actions aimed at the merger ("Merger") of JELCZ (the acquiring company) with RFK (the acquired company) pursuant to Art. 492 § 1 point 1 of the Commercial Companies Code.

  5. Figure

    The total credit limit was set to 105 million PLN with the financing availability period extended to November 24, 2028, based on the provisions of the Annex.

    Source quote
    “Pursuant to the provisions of the Annex, the total credit limit made available under the Agreement was set at the amount of PLN 105 million, with the availability period of financing under the Agreement extended to November 24, 2028.”

Tone

How upbeat the language was, compared with other companiesiTone counts positive minus negative finance words, adjusted for length. Executives mostly speak positively, so the labels compare each call with every company's latest call: “typical” is the middle third, “very upbeat” the top tenth, “cautious” the bottom tenth.. Dot: Q2 2026. Ring: Q2 2025.

Report language Typical (was typical)

Typical for a company report — more upbeat than in Q2 2025. Periodic reports carry legally required risk wording, so their tone moves little and is a weak signal.

Full figures

PLN · PAP Biznes report (2026-08-31)

Metric Q2 2026 Q2 2025 Change
Revenue 1.00B 1.04B −3.0%
Gross profit 91.1M 100.8M −9.7%
Operating income 50.7M 64.8M −21.8%
Net income 39.8M 49.4M −19.6%
EPS 0.16 0.20 −20.7%
P/E today 13.2 13.9 12-mo loss —

Topics

Topics are drawn from the full report text, not management commentary.

Most discussed now

  • Rising Polimex Mostostal is responsible for formulating the opinion on this condensed interim consolidated financial statement based on the review…

Faded since Q2 2025

  • Dropped Projects, as the difference between the selling price and the estimated total costs of the contract (the sum of incurred costs and costs…
  • Dropped In the presented period, the largest increase in value occurred in the position of construction in progress totaling 5,304 thousand.
  • Dropped The operations of the company CZKS are being continued, and measures are also being taken to ensure the safety of employees and the…
  • Dropped In the event that a revaluation is conducted, the Company obtains fair value appraisals for the respective locations of real estate and…

Latest announcements

Official filings, newest first. Summaries are generated from each filing and its attachment; every figure is checked against the source.